Chirman's speach
  Group info
  Honor
  Arrives Golden
   
 
 
 
 

   

Jincheng EmbroideryIs the foreign sole-source investment enterprise, the area 35,619 square meters, the total floor space amounts to 54,000 square meters, the total investment Renminbi 100 million Yuan, the standard workshop is completed in 2005 year's end. The company is located the Chinese textile collection and distribution center --- Shaoxing tan oak bridge economic development zone, east near the plum middle of the mill, the Shanghai and Hangzhou ð® highway, south depends on north the tan oak the main road, the geographical features position superior, the transportation is extremely convenient.
   The company according to the international idea design, the international pattern management, enjoys the foreign merchant preferential policy, necessary consummation, environment exquisite, berth sufficient, the difference is unimpeded, each kind of different area suits the different profession demand. Each workshop high drain buries in advance, the water and electricity, the vapor pipeline, the fire facility necessary are complete, in the factory district is equipped with the gate guard to be on duty day and night. The entire factory district is composed by three big sub-area, namely: Production, commercial work and quarters.
    The company mainly by introduces the embroidery, the clothing, the warp knitting, the needle textile intensive processing and the foreign trade work contour scale project primarily. Intends to become the embroidery the enterprise, then directly rents the ready-made standard workshop, also may divide the land to sell the standard workshop.
    Welcome the Chinese and foreign industry and commerce public figure to ally wholeheartedly promotes education.

The hiring (sells) the building specification and
the necessary facility data sheet
Type
Necessary facility
With area(m2)
Floor space
Enginee-
ring structure
Layer¡¢Height
Specific-
ation
Electric power
Running water, wide band, communication
Window
Ground processing
The health dumps pollutants
Security fire prevention
Attached facility

1#
Workshop

2168
6506
Frame
Three¡¢11.4m
Long120m*
Width18m
400kv
OK
Models the steel
wear-resisting
OK
OK
Goods ladder

2#
Workshop

2223
6668
Frame
Three¡¢11.4m
Long123m*
Width18m
400kv
OK
Models the steel
wear-resisting
OK
OK
Goods ladder

3#
Workshop

1952
5858
Frame
Three¡¢11.4m
Long108m*
Width18m
400kv
OK
Models the steel
wear-resisting
OK
OK
Goods ladder

4#
Workshop

2060
6182
Frame
Three¡¢11.4m
Long114m*
Width18m
400kv
OK
Models the steel
wear-resisting
OK
OK
Goods ladder

5#
Workshop

2438
7316
Frame
Three¡¢11.4m
Long135m*
Width18m
400kv
OK
Models the steel
wear-resisting
OK
OK
Goods ladder

6#
Workshop

2444
7334
Frame
Three¡¢11.4m
Long136m*
Width18m
400kv
OK
Models the steel
wear-resisting
OK
OK
Goods ladder
Combined workshop
1337
6137.3
Frame
Four¡¢Five¡¢19m
Long80m*
Width16m
300kv
OK
Models the steel
wear-resisting
OK
OK
Guest ladder
Office building
1273
6415.3
Frame
Four¡¢Five¡¢19m
Long85m*
Width16m
Free division
Illumin-
ation
OK
Models the steel
wear-resisting
OK
OK
Guest ladder
Dormitory
1177
4709
Frame
Four¡¢12m
Different
wrap
Illumin-
ation
OK
Models the steel
wear-resisting
OK
OK
Balcony
 

COPYRIGHT(C)2006   GOLDEN GROUP Tech£ºlanhei